Sites in the United States
Headline specs for each site. Open a site for its page, or ask for the site packs under NDA.
North Dakota
100MW feed line ready, power expected 2027 subject to a signed utility contract; a further 100MW in study for 2030. MISO grid. For sale.
View site →15MWHickory, North Carolina
Existing ~50,000 sq ft building on 10 acres, 3MW live, upside to 50MW. Sale, lease or colocation.
View site →12MW to 300MWNorth Carolina
Fund-backed development.
View site →30MWBoston, Massachusetts
Headline specs and site pack on request.
View site →50MWTexas
Pairs with the prefab AI data center design.
View site →50MWLas Vegas, Nevada
Solar power.
View site →25MWNew Mexico
Solar power, the lowest power cost in the portfolio.
View site →How It Works
Vocom introduces qualified buyers and tenants to the owner, coordinates diligence and supplies what goes inside.
Tell Us the Requirement
The buyer or tenant, the megawatts needed and the target date.
NDA, Then the Site Pack
Exact location, pricing, power documents and photos go to qualified requests under NDA.
Diligence and Fit-Out
Figures are checked in diligence. Servers, optics and fiber can come on one order from Vocom.
Buy, Lease or Build
Buy
Take over a powered site or campus. Fastest route to owning capacity, with diligence in place of construction.
Buy a data center →1 to 6 months for ready spaceLease
Colocation, wholesale suites, powered shell or containerized units. Lowest upfront capital.
Lease and colocation →15 months with prefabBuild
A prefab AI data center design on a site with secured power, against 24 to 48 months for a conventional build.
Build a data center →Sites in Other Regions
Japan
View sites →3 sitesTaiwan
View sites →5 sitesSoutheast Asia and Australia
View sites →1 siteMiddle East
View sites →Own a site or represent a buyer? See working with Vocom on data centers.
Frequently Asked Questions
Which data center sites does Vocom list in the United States?
North Dakota, Up to 230MW, Hickory, North Carolina, 15MW, North Carolina, 12MW to 300MW, Boston, Massachusetts, 30MW, Texas, 50MW, Las Vegas, Nevada, 50MW and New Mexico, 25MW. Each site has its own page with the headline specs.
Can I see exact locations and pricing?
Yes, once an NDA is in place. Publicly we list the region and headline specs only. Pricing, the exact location and the site documents go to qualified buyers and tenants with the site pack.
Can I buy, lease or build on these sites?
It depends on the owner. Some sites are for sale, some offer colocation or long-term leases, and some are land with power for a new build. Tell us what you need and we will say which sites fit.
Are the capacity figures confirmed?
Capacity, power and timing figures are provided by the site owners and are verified in diligence. Documents, pricing and exact locations go to qualified buyers under NDA.
How do I request a site pack?
Use the form on this page, or email kevin@vocom.com with the buyer or tenant, the megawatts needed and the target date. The NDA comes first, then the site pack.
Capacity, power and timing figures are provided by the site owners and are verified in diligence. Documents, pricing and exact locations go to qualified buyers under NDA.