Build an AI data center
A site-ready design for a liquid-cooled AI hall, built from prefab modules made off-site while the ground is prepared, so the schedule runs in parallel. Pair it with land and power from our site portfolio, or with land you already control.
Prefab AI data center, Phase I
Send the site or region, MW and target date. We reply with a design fit, partners and a schedule.
A concept design for an AI campus for neoclouds on industrial land in Texas, built as a prefab modular steel structure. Phase II adds a second building on the same plot.
This is a design package, not a powered site. Land, the utility contract and the power price are set for each client.
Modules are designed and built off-site while US contractors prepare the ground, so the two run at the same time instead of one after the other.
Coordination, cost control, quality and handover across the whole program.
Diligence, design and permits.
Modules, mechanical and electrical systems, integration and shipping.
Groundworks by local US subcontractors, then module assembly.
Verification and testing before go-live.
Trunks, cabling and transceivers from Vocom on one order, delivered to site.
Data center fiber →A conventional build takes 2 to 4 years. Phases 2 to 4 usually run in parallel, because power and permits set the critical path. The highlighted phases carry the longest lead times.
Secure power before spending on land or design. Sites without a credible grid date are the most common cause of failed projects.
Land with power, or a firm date for it. The full site list has the rest.
Pairs with the prefab design above.
The lowest power cost in the portfolio, suited to cost-sensitive, large-scale compute.
Nuclear and thermal power, built in three phases of 100MW, 250MW and 650MW, so capital goes in stages.
A digital park a short ferry ride from Singapore, with a dedicated power plant under construction and grid interconnection planned for 2027. The plant is coal-fired, with solar planned later. Subsea fiber reaches Singapore in under 11ms.
Full 300MW available, across the causeway from Singapore.
The largest single site in the portfolio.
Why build with prefab modules?
The modules are made off-site while the ground is prepared, so the two run in parallel. The plan runs about 15 months from design to commissioning, against 24 to 48 months for a typical conventional build.
What does it cost to build an AI data center?
Industry figures put a build at roughly $9M to $15M per MW before IT equipment. The design package and partners are priced per project.
Do I have to use one of your sites?
No. The design pairs with any site in our portfolio or land you already control, as long as the power date is credible.
Can Vocom supply what goes inside?
Yes. Vocom supplies the fiber cabling, optical transceivers and Supermicro AI servers for the halls, on one order delivered to site.
Capacity, power and timing figures are provided by the site owners and are verified in diligence. Documents, pricing and exact locations go to qualified buyers under NDA.