Sites in Southeast Asia and Australia
Headline specs for each site. Open a site for its page, or ask for the site packs under NDA.
Rayong, Thailand
100MW available now, containerized IDC in 5MW units.
View site →20MWRayong, Thailand
Standalone site for edge or regional deployments.
View site →500MWBatam, Indonesia
Full 500MW available, near Singapore, subsea fiber to Singapore and Jakarta.
View site →300MWJohor Bahru, Malaysia
Full 300MW available.
View site →25MWSydney, Australia
25MW remaining of a 100MW campus.
View site →How It Works
Vocom introduces qualified buyers and tenants to the owner, coordinates diligence and supplies what goes inside.
Tell Us the Requirement
The buyer or tenant, the megawatts needed and the target date.
NDA, Then the Site Pack
Exact location, pricing, power documents and photos go to qualified requests under NDA.
Diligence and Fit-Out
Figures are checked in diligence. Servers, optics and fiber can come on one order from Vocom.
Buy, Lease or Build
Buy
Take over a powered site or campus. Fastest route to owning capacity, with diligence in place of construction.
Buy a data center →1 to 6 months for ready spaceLease
Colocation, wholesale suites, powered shell or containerized units. Lowest upfront capital.
Lease and colocation →15 months with prefabBuild
A prefab AI data center design on a site with secured power, against 24 to 48 months for a conventional build.
Build a data center →Sites in Other Regions
United States
View sites →4 sitesJapan
View sites →3 sitesTaiwan
View sites →1 siteMiddle East
View sites →Own a site or represent a buyer? See working with Vocom on data centers.
Frequently Asked Questions
Which data center sites does Vocom list in Southeast Asia and Australia?
Rayong, Thailand, 800MW, Rayong, Thailand, 20MW, Batam, Indonesia, 500MW, Johor Bahru, Malaysia, 300MW and Sydney, Australia, 25MW. Each site has its own page with the headline specs.
Can I see exact locations and pricing?
Yes, once an NDA is in place. Publicly we list the region and headline specs only. Pricing, the exact location and the site documents go to qualified buyers and tenants with the site pack.
Can I buy, lease or build on these sites?
It depends on the owner. Some sites are for sale, some offer colocation or long-term leases, and some are land with power for a new build. Tell us what you need and we will say which sites fit.
Are the capacity figures confirmed?
Capacity, power and timing figures are provided by the site owners and are verified in diligence. Documents, pricing and exact locations go to qualified buyers under NDA.
How do I request a site pack?
Use the form on this page, or email kevin@vocom.com with the buyer or tenant, the megawatts needed and the target date. The NDA comes first, then the site pack.
Capacity, power and timing figures are provided by the site owners and are verified in diligence. Documents, pricing and exact locations go to qualified buyers under NDA.