Buy a Data Center: Powered AI Sites and Campuses for Sale
Buying a powered site is the fastest way to own capacity. Vocom introduces qualified buyers to data center owners, from an operating 15MW building in North Carolina to a 230MW campus in North Dakota with 100MW energized today.
Tell us the size, region and timing you need. Qualified buyers get the site pack under NDA.
Data Center Sites for Sale
Two US sites are on the market now. Both come with power already live, which is what takes longest to get on a new build.
North Dakota
230MW Data Center Campus
A 100-acre campus on the MISO grid in eastern North Dakota, offered as a sale of the entity that holds it. 100MW is energized today, so a buyer gets speed to market with a defined timeline for the rest.
Energized
100MW, substation live and in use
Pathway
A further 100MW under an approved 200MW transmission study
Co-located
30MW more on nearby energized sites
Water
About 1 MGD continuous and 3 MGD peak, plus up to about 3.3 MGD of reuse water for cooling
Fiber
Two carriers live at the site, a third ready to build to it
North Carolina
15MW Building in Hickory, NC
An existing building of about 50,000 sq ft on 10 acres, served by Duke Energy and already running as a colocation facility hosting GPU servers.
Power
3MW live, 15MW with a 44kV transformer build-out
Upside
Up to 50MW via a new 100kV line
Structure
Sale, or long-term lease or colocation
Nearby
Three more sites in the area: 25MW, 7MW and one at an early stage
Looking further afield? The full site list covers Japan, Taiwan, Southeast Asia, Australia and Dubai.
How a Purchase Works
Buying shifts the work from construction to diligence and structuring. Most deals close in 4 to 9 months.
Step 1
Letter of Intent
Price, structure and 30 to 90 days of exclusivity while you run diligence.
Step 2
Asset or Share Deal
An asset deal avoids unknown liabilities. A share deal keeps licenses, permits and contracts in place.
Step 3
Diligence
Grid capacity transfers to the buyer
Ground lease term
Equipment age and condition
Customer change-of-control terms
Certifications
Fill the Building
The day you own the site, it needs servers, optics and fiber. Vocom supplies all three on one order, and brings in construction and cooling partners when a retrofit is part of the plan.
Server rows in a data hallRacks cabled and readyPower comes first
Frequently Asked Questions
What documents can I see before making an offer?
Qualified buyers get the site pack under NDA. For the North Dakota campus that includes the interconnection agreement, queue position and energization certificate. For Hickory it includes the utility service documents and the transformer build-out scope.
Are the power figures confirmed?
They are provided by the sellers and checked in diligence before you commit. We share the source documents rather than ask you to take the numbers on trust.
Can I lease instead of buying?
Yes. The Hickory building can also be leased or used as colocation, and we have space to lease in Dubai, Thailand and Sydney. See data center colocation and leasing.
Does Vocom take a stake in the site?
No. Vocom introduces the buyer and the seller and supplies the equipment that goes inside. The sale is between you and the owner.
Capacity, power and timing figures are provided by the site owners and are verified in diligence. Documents, pricing and exact locations go to qualified buyers under NDA.
Cookie Settings
We use cookies to enhance your experience, analyze site traffic and deliver personalized content. Read our Cookie Policy
Get Vocom Insights in Your Inbox
Fiber optic cable lead times, specification guides and AI infrastructure news for network builders.