Three Ways to Secure Capacity
Power, not property, is the scarce asset. Each route is a way to lock in reliable megawatts, a compliant building and a date.
Buy
Take over a powered site or campus. Fastest route to owning capacity, with diligence in place of construction.
Buy a data center →1 to 6 months for ready spaceLease
Colocation, wholesale suites, powered shell or containerized units. Lowest upfront capital.
Lease and colocation →15 months with prefabBuild
A prefab AI data center design on a site with secured power, against 24 to 48 months for a conventional build.
Build a data center →Data Center Sites by Region
Available capacity across the Americas, Asia-Pacific and the Middle East. Some sites are for sale, some lease space and some are land with power for a new build. Ask which fits your timeline.
| Location | Capacity | Notes |
|---|---|---|
| United States | ||
| North Dakota campus | 230MW | 100MW energized today, 100MW on a defined power pathway, 30MW co-located. MISO grid. For sale |
| Hickory, North Carolina | 15MW | Existing ~50,000 sq ft building on 10 acres, 3MW live, upside to 50MW. Sale, lease or colocation |
| North Carolina | 12MW to 300MW | Fund-backed development |
| Boston, Massachusetts | 30MW | |
| Texas | 50MW | Pairs with the prefab AI data center design |
| Las Vegas, Nevada | 50MW | Solar power |
| New Mexico | 25MW | Solar power, the lowest power cost in the portfolio |
| Japan | ||
| Hokkaido | 1.2GW | |
| Kyushu | 1GW | Nuclear and thermal power, phased 100MW, 250MW, 650MW |
| Kanto | 500MW | |
| Kansai | 200MW | |
| Taiwan | ||
| Nangang, Taipei | 10MW | 5MW grid plus 5MW solar |
| Keelung | 5MW | |
| Hsinchu | 3MW | |
| Southeast Asia and Australia | ||
| Rayong, Thailand | 800MW | 100MW available now, containerized IDC in 5MW units |
| Rayong, Thailand | 20MW | Standalone site for edge or regional deployments |
| Batam, Indonesia | 500MW | Full 500MW available, near Singapore, subsea fiber to Singapore and Jakarta |
| Johor Bahru, Malaysia | 300MW | Full 300MW available |
| Sydney, Australia | 25MW | 25MW remaining of a 100MW campus |
| Middle East | ||
| Dubai, UAE | 40MW | Colocation. 30MW IT load operational, further 10MW blocks in April, June and July 2027 |
More sites in Taiwan, Japan, Thailand and Indonesia come online from 2028. Site packs with power, fiber and pricing are shared under NDA.
Build, Buy or Lease at a Glance
Approximate industry ranges, not quotes. Hybrids are common: a lease with a purchase option, or a sale-leaseback, lets you control the asset now and settle ownership later.
| Build | Buy | Lease | |
|---|---|---|---|
| Time to capacity | 24 to 48 months; grid power is often the bottleneck | 4 to 9 months to close, then integration | 1 to 6 months for ready suites, up to 18 months build-to-suit |
| Upfront capital | Highest: about $9M to $15M per MW before IT | Purchase price plus upgrade capex | Lowest: deposit, fit-out and first rent |
| Control | Total | Total, but inherits legacy contracts | Limited to what the lease grants |
| Main risk | Power delivery, permits, cost overrun | Hidden defects and legacy liabilities | Landlord dependency, rent escalation |
| Best for | Hyperscalers with a secured power pipeline | Funds and operators wanting instant scale | AI and cloud tenants, market entry |
From Fiber to Rack
One accountable supplier for the physical layer of an AI build. Most customers start with fiber and optics, then add what the build needs next.
- 01
Fiber and transceivers
Cable, MPO and MTP trunks and 400G, 800G and 1.6T optics, with firm lead times.
Fiber products → - 02
AI servers
Supermicro AI and GPU servers for the cluster the optics connect.
AI servers → - 03
Data center space
Powered sites to buy, space to lease, or a prefab build on secured power.
Data center sites → - 04
GPU capacity
Compute while your own build is finished.
GPU solutions → - 05
Software
RenOS runs AI agents across models under your rules, with an audit trail.
RenOS →
Servers, Optics and Fiber for the Hall
Vocom is an authorized Supermicro dealer. The same team that finds the space supplies what goes in it, on one order delivered to site.
Inside an AI Data Center
Power, racks, fiber and the people who run them: everything the build needs, from one team.
Frequently Asked Questions
Does Vocom own these data centers?
No. The sites belong to their owners and developers. Vocom introduces qualified buyers and tenants, coordinates diligence, and supplies the fiber, optics and servers that go inside.
Can I buy, lease or build on every site?
It depends on the owner. Some sites are for sale, some offer colocation or long-term leases, and some are land with power for a new build. Tell us what you need and we will say which sites fit.
How fast can I get capacity?
Ready colocation space can be live in 1 to 6 months. Buying a powered site usually takes 4 to 9 months to close. A prefab build runs about 15 months from design to commissioning, against 24 to 48 months for a conventional build.
What does power cost at these sites?
Indicative rates across the portfolio run from $0.02 to $0.19 per kWh, depending on the country and power source. Site-by-site rates come with the site pack.
Can you supply the servers and fiber as well?
Yes. Vocom supplies Supermicro AI servers, optical transceivers and fiber cabling, so the space and what goes inside it can come from one team.
Capacity, power and timing figures are provided by the site owners and are verified in diligence. Documents, pricing and exact locations go to qualified buyers under NDA.